Saint Hedwig, Texas
The Martinez IV Wastewater Treatment Plant Expansion, operated by the San Antonio River Authority, initially built a new facility with 0.25 MGD capacity, expandable to 2.0 MGD, featuring headworks, biological treatment, clarifiers, UV disinfection, dewatering, and a 17,000-foot sewer collection line