McCook, Illinois
The McCook Reservoir is a critical component of the Chicago area's Tunnel and Reservoir Plan (TARP), designed to capture and store combined stormwater and wastewater to prevent flooding and reduce pollution in local waterways. Stage 1, completed in 2017, provides 3.5 billion gallons of storage capac